Pipe flanges · Tightening

24 bolt flange tightening pattern

Number the bolts 1 to 24 clockwise from any one. Tighten them in this cross (star) order, every pass:

1 – 13 – 7 – 19 – 4 – 16 – 10 – 22 – 2 – 14 – 8 – 20 – 5 – 17 – 11 – 23 – 3 – 15 – 9 – 21 – 6 – 18 – 12 – 24

Tightening order for 24 bolts: 1, 13, 7, 19, 4, 16, 10, 22, 2, 14, 8, 20, 5, 17, 11, 23, 3, 15, 9, 21, 6, 18, 12, 24123456789101112131415161718192021222324

The pattern, in groups of four

  1. Group 1: 1, 13, 7, 19
  2. Group 2: 4, 16, 10, 22
  3. Group 3: 2, 14, 8, 20
  4. Group 4: 5, 17, 11, 23
  5. Group 5: 3, 15, 9, 21
  6. Group 6: 6, 18, 12, 24
Why this order

Each group of four is two pairs straight across, a quarter turn apart, so the gasket is pressed evenly. Each next group starts as far as it can from the groups already done. The amber line traces the first group. A crossing pattern, as Garlock's installation guide describes; we generate the exact order from one rule: fours 90° apart, each next four as far as possible from those done.

Passes

  1. Snug Run every nut down by hand, then snug each with a short wrench, in the star.
  2. 30% Every bolt to about 30% of the target torque, in the star.
  3. 60–70% Every bolt to 60–70% of the target, in the star.
  4. 100% Every bolt to the full target, in the star.
  5. Check At 100%, go bolt to bolt round the flange (1, 2, 3 …) until no nut turns any more.

The passes as the gasket makers print them, in our own words. Teadit, for one, prints 30%, 60% and 100% for its 913M spiral wound gaskets, then rounds until no nut turns.

A starting point from published gasket-maker tables. Your site’s bolting procedure, or a PCC-1 qualified joint procedure, governs pressure piping.

Sources

Sources2