Pipe flanges · Tightening
24 bolt flange tightening pattern
Number the bolts 1 to 24 clockwise from any one. Tighten them in this cross (star) order, every pass:
1 – 13 – 7 – 19 – 4 – 16 – 10 – 22 – 2 – 14 – 8 – 20 – 5 – 17 – 11 – 23 – 3 – 15 – 9 – 21 – 6 – 18 – 12 – 24
The pattern, in groups of four
- Group 1: 1, 13, 7, 19
- Group 2: 4, 16, 10, 22
- Group 3: 2, 14, 8, 20
- Group 4: 5, 17, 11, 23
- Group 5: 3, 15, 9, 21
- Group 6: 6, 18, 12, 24
Why this order
Each group of four is two pairs straight across, a quarter turn apart, so the gasket is pressed evenly. Each next group starts as far as it can from the groups already done. The amber line traces the first group. A crossing pattern, as Garlock's installation guide describes; we generate the exact order from one rule: fours 90° apart, each next four as far as possible from those done.
Passes
- Snug Run every nut down by hand, then snug each with a short wrench, in the star.
- 30% Every bolt to about 30% of the target torque, in the star.
- 60–70% Every bolt to 60–70% of the target, in the star.
- 100% Every bolt to the full target, in the star.
- Check At 100%, go bolt to bolt round the flange (1, 2, 3 …) until no nut turns any more.
The passes as the gasket makers print them, in our own words. Teadit, for one, prints 30%, 60% and 100% for its 913M spiral wound gaskets, then rounds until no nut turns.
A starting point from published gasket-maker tables. Your site’s bolting procedure, or a PCC-1 qualified joint procedure, governs pressure piping.